New construction punch list: the final walkthrough
Fiveover editorial team 9 min read
A new home looks finished long before it is. The paint is on, the floors are in, and the sales office hands you a date for closing. The final walkthrough is the last moment when the builder’s crews are still on site and you still have something the builder wants: your signature and your money. What you write down that day decides what gets fixed without an argument.
This guide covers how to run the walkthrough, what a useful punch list looks like, how to get the builder to sign it, what holdbacks can and can’t do, and what happens if you find defects after you move in. The law examples are from California and Texas. Other states have their own rules, and your purchase agreement or construction contract comes first, so read it before the walkthrough.
What the final walkthrough is
There are two common situations, and the walkthrough means slightly different things in each.
- You buy a new home from a builder. The walkthrough (sometimes called a pre-closing or new home orientation) happens shortly before closing. You check that the home is finished and works. After closing, open items depend on the builder’s promise and its warranty.
- You hire a contractor to build or remodel. The walkthrough happens at or near completion, before the final payment. Here the money you still owe, including any retention, is part of the conversation.
In both cases the result should be one written list, dated, that the builder or contractor has seen and signed.
What goes on a punch list
A punch list is every item that is unfinished, damaged or doesn’t work yet. It is not a wish list: upgrades you didn’t buy don’t belong on it. Each item needs five things:
- Where: the room and the spot (“primary bath, left sink”, “garage, north wall”).
- What’s wrong: one sentence a crew can act on (“cabinet door rubs the frame and won’t close”).
- A photo: close up, plus one wider shot that shows where it is.
- Who fixes it: usually the builder, and note it if a trade or a supplier was named.
- By when: a date, not “soon”.
Typical items, grouped the way most walkthroughs go:
| Area | What to check | Typical punch items |
|---|---|---|
| Fit and finish | Paint, trim, drywall, cabinets, countertops, flooring, mirrors | Paint drips, nail pops, gaps in trim, chipped countertop edge |
| Doors, windows | Every door and window opens, closes and locks; screens; weatherstripping | Door rubs the frame, window lock missing, torn screen |
| Plumbing | Every faucet hot and cold, drains, toilets, under-sink connections, water heater | Slow drain, drip under the sink, loose toilet |
| Electrical | Every switch and outlet, GFCI outlets trip and reset, light fixtures, doorbell, smoke alarms | Dead outlet, switch controls nothing, missing cover plate |
| HVAC | Heating and cooling both run, every vent blows, thermostat works, filter in place | One room doesn’t cool, rattling vent |
| Appliances | Each one runs; oven heats; dishwasher drains; range hood vents | Dishwasher not connected, dent in the refrigerator door |
| Outside | Grading slopes away from the house, gutters and downspouts, driveway, fences, exterior paint | Water pooling by the foundation, cracked walkway, missing downspout |
| Attic, garage | Insulation in place, garage door opener and its safety sensor, fire-rated door to the house closes | Insulation pushed aside, garage door doesn’t reverse |
Bring blue painter’s tape to mark spots on walls, a flashlight, a phone charger and an outlet tester. Run water in every tap for a minute. Open and close every door and window. Walk the outside, and if you can, look at it after rain.
Photograph it the way someone else will read it
A photo says more than a description, but only if a stranger can tell what it shows. For each item take one close-up and one wider shot with something that places it (a window, a vanity, a corner). Put tape or a finger next to small things like hairline cracks. Keep the photos with the item they belong to. A camera roll of 140 unnamed pictures is hard to use three months later.
Also photograph what is fine in the places that tend to cause trouble later: the finished floors, countertops and appliance fronts. That shows the condition on the walkthrough day, before movers and furniture arrive.
Getting the builder to sign off
The punch list only helps if the builder has seen it. At the end of the walkthrough, go through the list with the builder’s representative and write down the outcome:
- Accepted: nothing open.
- Accepted with reservations: the home is accepted, with the listed items to be fixed by the dates given.
- Refused: something stops you from accepting, with the reason.
Then ask the representative to sign and date it, and keep a copy. If the builder uses its own walkthrough form, read the fine print before you sign. A list of open items is one thing. A line saying the home is accepted “as is” or “complete” is another. Add your items to the builder’s form, or write “see attached punch list, 23 items” and attach yours.
Worked example: closing is set for Friday, October 16, 2026. The walkthrough is on Monday, October 12, at 9 a.m. You find 23 items. The builder’s representative signs the list with the result “accepted with reservations” and fix dates: 18 items by October 15, and 5 (a cracked walkway slab, a replacement cabinet door, an exterior paint touch-up and two backordered fixtures) by October 30. You book a re-check for October 15 at 4 p.m. and mark each item fixed or still open on the same list.
Holdbacks and retention
It is natural to want to keep money back until the list is done. Whether you can depends on the contract, not on the walkthrough.
Buying from a builder. The full price is normally paid at closing. Some purchase contracts or lenders allow an escrow holdback for unfinished work, but only if the contract or the lender provides for it. If yours doesn’t, the signed punch list with fix dates is what you have, so make it specific.
Hiring a contractor. Retention (holding back a percentage of each payment until completion) is common, and states regulate it:
- California: for private works contracts entered into on or after January 1, 2026, retention may not exceed 5% of any progress payment or 5% of the contract price, with limited exceptions (SB 61, adding Civil Code § 8811).
- Texas: during the work and for 30 days after the work is completed, the owner must retain 10% of the contract price, or of the value of the work done, on contracts where a mechanic’s lien may be claimed (Property Code § 53.101). The money is there to secure payment for subcontractors and suppliers.
Retention is not a penalty for open punch items. Paying it late or keeping it without a contract reason can cause its own dispute, so talk to the contractor, or a lawyer, before you hold back more than the contract says.
After closing: what California and Texas require
You will find things after you move in. What you do next depends on your state’s rules.
California: the Right to Repair Act
California’s Right to Repair Act (Civil Code § 895 ff.) covers newly built homes sold as individual dwelling units, like single-family homes and condominium units.
- Standards (§ 896). The act lists building standards for water intrusion (roofs, windows, foundations, drainage), structure, soils, fire protection, plumbing, electrical and more. A claim is about the original construction failing one of these standards.
- Fit and finish (§ 900). The builder must give at least a one-year express written warranty for the fit and finish of cabinets, mirrors, flooring, interior and exterior walls, countertops, paint finishes and trim. If it doesn’t, the law sets the warranty at one year (§ 900). Many punch items are exactly these, so write them down early.
- Notice before a lawsuit (§ 910). Before suing, the homeowner sends the builder written notice by certified mail, overnight mail or personal delivery. It gives your name, address and preferred way of contact, says that you claim a violation of the standards, and describes the claim in reasonable detail, including the nature and location of each defect as far as you know it (§ 910).
- The builder’s turn. The act then gives the builder set deadlines to acknowledge the claim, inspect, and offer a repair. An offer must say step by step what will be repaired, how and where, and set a reasonable completion date (§ 917).
A walkthrough list with locations and photos is a good starting point for a § 910 notice, because the notice asks for exactly that: what and where.
Texas: the Residential Construction Liability Act
In Texas, Property Code chapter 27 covers construction defects in new homes and in alterations, repairs or additions to existing ones. At least 60 days before filing suit, the owner gives the contractor written notice by certified mail, return receipt requested, describing the defects in reasonable detail. On the contractor’s written request, it gets a reasonable chance to inspect within 35 days after receiving the notice, and the owner provides evidence of the defects such as photographs and expert reports. The Texas State Law Library collects the statute and plain-language guides.
Write it down on site
The punch list is easiest to get right while you are standing in front of each item, and hardest to rebuild from memory that evening. A final walkthrough and punch list report does this as you go: you walk through and talk, AI writes each section and each punch item, and the photos land in their section next to the item. Before you finish, AI lists what’s missing, and you can change anything it wrote. The builder can sign on your phone, from a QR code on their own phone, or later by email, and you get a sealed PDF with a verification code.
If you are the contractor, the same record works from your side, together with the T&M tickets for any extra work along the way.
Checklist: what to write down
- Date, start time and address, and who walked through (names and roles)
- For each item: room and spot, what’s wrong, photos, who fixes it, the fix-by date
- Items that are fine but easy to damage later (floors, countertops, appliance fronts)
- Test results: water, drains, outlets, GFCIs, heating, cooling, appliances, garage door
- Meter readings and the keys, remotes and codes handed over
- The result: accepted, accepted with reservations, or refused, and why
- The builder’s signature and date, and the date of the re-check
- At the re-check: each item marked fixed or still open, with a new photo
Limits and when to get advice
A punch list records what you found and what was agreed. It doesn’t change your contract, and it isn’t a substitute for an independent home inspection, which can find what a walkthrough misses: roof, attic, crawl space, structure. It’s worth booking one before the final walkthrough.
Get advice from a construction or real estate lawyer before you refuse to close, hold back money the contract doesn’t allow, or send a § 910 or chapter 27 notice for a serious defect. The deadlines and steps in these laws matter, and a short consultation early is cheaper than repairing a missed one.
Questions people ask
- When should the final walkthrough of a new home happen?
- Close enough to closing or final payment that the work is actually finished, and early enough that the builder can still fix the items before you pay. Your purchase agreement or construction contract usually sets the date. A few days before closing is common, and ask for a second walkthrough to check the fixes.
- Should I sign the builder’s walkthrough form?
- Read what it says first. Signing a list of open items is fine. Signing a line that says you accept the home "as is" or that all work is complete is different. If items are still open, write them on the form, or attach your own punch list, before you sign.
- What if I find defects after closing in California?
- The Right to Repair Act (Civil Code § 895 ff.) sets building standards in § 896 and a one-year minimum warranty for fit and finish items in § 900. Before suing, a homeowner gives the builder written notice under § 910, by certified mail, overnight mail or personal delivery, describing each claimed defect and where it is.
- Can I hold back money until the punch list is done?
- Only if your contract allows it. When you buy from a builder, the full price is usually paid at closing, so get the repair promise in writing. When you hire a contractor, retention is common. California caps it at 5% for private works contracts from 2026, and Texas owners must retain 10% for 30 days after completion.
You talk. AI writes the report.
Final walkthrough and punch list: walk through and say what you see. Then the PDF is sealed.
Sources
- Cal. Civil Code § 896, building standards (California Legislative Information)
- Cal. Civil Code § 900, fit and finish warranty (California Legislative Information)
- Cal. Civil Code § 910, prelitigation notice (California Legislative Information)
- Cal. Civil Code § 917, offer to repair (Justia)
- SB 61 (2025), private works retention (LegiScan bill text)
- Texas Property Code ch. 27, Residential Construction Liability (Texas Legislature)
- Construction defects (Texas State Law Library)
- Texas Property Code § 53.101, required retainage (FindLaw)
General information, not legal advice. Laws change: check the linked sources for your case.