Move-in / move-out inspection report
Date
Details
1. Entrance & hallway
Walls, ceiling, floor, front door and lock, lights and switches, anything damaged
2. Living room
Walls, ceiling, floor, windows and blinds, doors, radiators, anything damaged
3. Kitchen
Walls, floor, stove and oven, fridge, sink and faucet, cabinets and countertop, hood
4. Bathroom
Walls and tiles, floor, toilet, shower or tub, sink and faucet, ventilation, any mold
5. Bedroom
Walls, ceiling, floor, windows and blinds, doors, built-in closets, anything damaged
6. Meter readings
Where each meter is, and anything unusual about it
7. Keys
Which keys, fobs and cards were handed over, and any that are missing
8. Defects found
Damage beyond normal wear, where it is, and anything agreed about it
| Location | Defect | Severity |
|---|---|---|
| Minor Major | ||
| Minor Major | ||
| Minor Major | ||
| Minor Major |
Declarations
Landlord and tenant inspected the property together. Its condition at the handover is as recorded in this report, including the photos. Defects that were not visible during the inspection are not covered by this report.
The keys were handed over in the numbers listed.
The meter readings were read together and are the basis for the utility bills.
Signatures
Landlord / property manager
Place and date
Print name
Signature
Tenant
Place and date
Print name
Signature